Construction method for integrally jacking and slipping net frame

The invention discloses a construction method for integrally jacking and slipping a net frame, which comprises the following steps: firstly, net frame integral jacking: after the net frame is spliced on the ground, a plurality of jacking devices are uniformly placed in the net frame, each jacking de...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHENG ZHENJIE, FAN JIANMIN, FENG LING, JI SULING, DU PENGQUAN, CUI XINYU, FENG HAIYAN, LI YONGHONG, CHU DAWEI, FAN YUNPENG, ZHANG XIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for integrally jacking and slipping a net frame, which comprises the following steps: firstly, net frame integral jacking: after the net frame is spliced on the ground, a plurality of jacking devices are uniformly placed in the net frame, each jacking device includes a jacking rack progressively heightened and a jacking-up hydraulic jack, and the jacking-up hydraulic jacks push the net frame to a predetermined height through the jacking racks progressively heightened; secondly, net frame integral slipping: the jacking-up hydraulic jacks are horizontally pushed by a screw jack to enable the net frame to slip to an assigned position; and thirdly, net frame mounting completion: the jacking-up hydraulic jacks fall, and the net frame falls to a structural chapiter, and then all the jacking devices and the slipping devices are dismantled. The method has the advantages that the construction speed is high, the quality control is excellent, measure investment is little, th