Construction method for overhead coal-fired boiler foundation
A construction method for overhead coal-fired boiler foundation includes the following steps: 1 the boiler foundation is supported with four pillars (1); 2 a steel plate (2) is placed on the four pillars, and a hole is disposed on the steel plate (2); 3 four beams (3) are arranged around the steel p...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A construction method for overhead coal-fired boiler foundation includes the following steps: 1 the boiler foundation is supported with four pillars (1); 2 a steel plate (2) is placed on the four pillars, and a hole is disposed on the steel plate (2); 3 four beams (3) are arranged around the steel plate (2); 4 a go-out plate is overhung around the beams to serve as the range for human movements; and 5 steel bars (5 and 6) of the pillars (1) and the beams (3) are obtained through a formula. |
---|