Large open caisson construction method in soft geological shaft

The invention discloses a large open caisson construction method in a soft geological shaft. The large open caisson construction method comprises the following steps of: firstly conducting preliminary flattening to an excavated surge shaft platform, then conducting formwork erection and casting of a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WU GAOJIAN, JIANG LINGYU, SUN LINZHI, REN YOULI, XIONG HAIHUA, LA CHENGYUN, ZHANG LI, CHEN FAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a large open caisson construction method in a soft geological shaft. The large open caisson construction method comprises the following steps of: firstly conducting preliminary flattening to an excavated surge shaft platform, then conducting formwork erection and casting of a first open caisson section, starting excavation sinking construction of the first open caisson section after the first open caisson section is cast, stopping excavation construction when the top of the first open caisson section is sunken to the surge shaft platform or a position which is slightly higher than the surge shaft platform, conducting formwork erection and casting of a second open caisson section, then conducting excavation sinking construction of the second open caisson section, and conducting construction according to the alternate operation method of formwork erection and casting and excavation sinking construction of the open caisson till design depth is reached. By adopting the sinking construction