Bridge bored pile hole wall opening protection method

The invention discloses a bridge bored pile hole wall opening protection method, which is used for protecting a hole wall opening of a bridge bored pile, which is provided with a sand covering layer and a crushed rock layer. The method comprises the following steps of: a, building a construction pla...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LIN, PI JUNYUN, WANG XIAOZHOU, FAN XUEMEI, HUANG DONGDONG, HUANG ZHONGHUA, LI LI, ZHOU WEI, YU XIANGJUN, NI HAOYE, LIU QIAONING, CAO SHIYUN, LI GUOPING, JI YUEHUA, XU GUOLIANG, LIU AILIN, XU BINGFA, TAN DELIN, YU WEI, ZHONG MIQING, TONG LINHONG, NONG DAIPEI, LUO LEIXIANG, FU GUOPING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a bridge bored pile hole wall opening protection method, which is used for protecting a hole wall opening of a bridge bored pile, which is provided with a sand covering layer and a crushed rock layer. The method comprises the following steps of: a, building a construction platform; b, inserting a steel casing in the construction platform to make the steel casing embedded in the crushed rock layer; c, arranging a drilling machine on the construction platform, and pre-drilling the steel casing to form pre-bored holes; d, pulling out the drilling machine, and inserting small casings into the pre-bored holes, wherein the small casings are provided with a plurality of stop lever holes and grouting nozzles; e, arranging stop levers in the stop lever holes, and arranging grouting devices on the grouting nozzles; and f, grouting by using the grouting devices, and detaching the grouting devices after the slurry is primarily cured. A mixture of cement and water glass is adopted as a filling mate