Water flushing construction method of static tubular pile of sand pile tip
The invention relates to a water flushing construction method of a static tubular pile of a sand pile tip, which sequentially comprises the following steps of: (1) determining the position of the pile, forming a hole in the position of the pile; then, filling the hole with sand; (2) hoisting the tub...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a water flushing construction method of a static tubular pile of a sand pile tip, which sequentially comprises the following steps of: (1) determining the position of the pile, forming a hole in the position of the pile; then, filling the hole with sand; (2) hoisting the tubular pile; installing the tubular pile on a pile driver; installing the pile tip of the tubular pile at the lower end of the tubular pile; aligning the pile tip of the tubular pile to the position of the pile; then, inserting the pile tip of the tubular pile into the sand in the hole; pressing the pile tip down to form the sand pile tip at the lower part of the pile tip of the tubular pile; and (3) piling; piling statically when the sand pile tip reaches a weak soil layer; and performing a water flushing method to aid the static piling when the sand pile tip reaches a sandy layer. The invention is suitable for piling construction under the geological condition that a thicker weak soil layer exists on high-density s |
---|