METHODS FOR WELL CONSTRUCTION AND COMPLETION

There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DA SILVA COSTA, RENAN, CAMPOS MANHAES, ALEXANDRE, MUSSI BAPTISTA, JOAO MARCELO, FERREIRA MACHADO, GIOVANI, FREIRE GRANDI, RICARDO, RAMOS JUNIOR, ANTONIO CARLOS, KOSLINSKI, CRISTIANE, PERNASETTI DUNLOP, KRIS, BRIGIDO DE MOURA FILHO, JOSE RICARDO, SANSEVERINO ABDU, JOAO PAULO, FERREIRA CHAVES VAZ, FREDERICO, BERTHOLDO DA CUNHA, CAROLINA, CAMPOS DE ARAUJO, OTAVIO, FARIA RIENTE, ALIEL, SALGUEIRO DE OLIVEIRA, GUSTAVO, SOUZA COSTA, GEORGE, MARAZZO GARCIA, LEONARDO, GONCALVES DE MOURA, EDNALDO
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in which a second drill is used for drilling, wherein a production adapter base, PAB, is installed in parallel with lowering a blowout preventer, BOP; and a third phase of the well construction in which a third drill is used for drilling, for the steps of landing and geonavigation inside a reservoir. L'invention concerne un procédé de construction de puits comprenant les étapes suivantes : une première phase de la construction de puits, dans laquelle un ensemble de fond de trou, BHA, muni d'un premier foret est utilisé pour le forage, et un tubage conducteur est abaissé dans le puits puis cimenté ; une deuxième phase de la construction de puits, dans laquelle un deuxième foret est utilisé pour le forage, une base d'adaptateur de production, PAB, étant installée en parallèle avec l'abaissement d'un bloc obturateur de puits, BOP ; et une troisième phase de la construction de puits dans laquelle un troisième foret est utilisé pour le forage, pour les étapes de déposer et de géonavogation à l'intérieur d'un réservoir.