AUTOMATIC WELLBORE CONDITION INDICATOR AND MANAGER
A method for monitoring condition of a wellbore includes initializing a value of at least one parameter having a relationship to likelihood of a drill string becoming stuck in a wellbore (the HCF). During drilling operations, at least one drilling parameter having a determinable relationship to the...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for monitoring condition of a wellbore includes initializing a value of at least one parameter having a relationship to likelihood of a drill string becoming stuck in a wellbore (the HCF). During drilling operations, at least one drilling parameter having a determinable relationship to the HCF is measured. In a computer, the value of the HCF is recalculated based on the at least one measured parameter. The initial value of the HCF and the recalculated values of the HCF are displayed to a user.
L'invention concerne un procédé qui permet de surveiller l'état d'un puits de forage et qui comprend l'initialisation d'une valeur d'au moins un paramètre ayant une relation de probabilité qu'une rame de forage sera coincée dans un puits de forage (le HCF). Pendant des opérations de forage, au moins un paramètre de forage, ayant une relation pouvant être déterminée avec le HCF, est mesuré. Dans un ordinateur, la valeur du HCF est recalculée sur la base du ou des paramètres mesurés. La valeur initiale du HCF et les valeurs recalculées du HCF sont affichées pour un utilisateur. |
---|