METHOD OF BUILDING A FLOOR FOR A BOILER CAGE
A method of building a floor for a boiler cage part is provided. The method first includes a step of building a single floor onto a lifting frame positioned on the ground, the whole lifting frame being positioned below the single floor. The method also includes a step of jacking-up the floor togethe...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method of building a floor for a boiler cage part is provided. The method first includes a step of building a single floor onto a lifting frame positioned on the ground, the whole lifting frame being positioned below the single floor. The method also includes a step of jacking-up the floor together with the lifting flame and then fixing the floor to a designated floor height. The method further includes a step of detaching the floor from the lifting flame followed by jacking-down the lifting flame to the ground. Multiple levels of floors are built from the higher most floor to the lower most floor by repeating the steps of building, jacking-up and jacking-down, which allows the method to be performed safely and efficiently on the ground. |
---|