METHOD OF BUILDING A FLOOR FOR A BOILER CAGE

A method of building a floor for a boiler cage part is provided. The method first includes a step of building a single floor onto a lifting frame positioned on the ground, the whole lifting frame being positioned below the single floor. The method also includes a step of jacking-up the floor togethe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YOSHIDA, YUUSUKE, SHINOHARA, SHOJI, KAWAGUCHI, SHIGEYOSHI, YOKOI, YUUJI, TAKESHITA, SHINICHIROU, KOMATSU, KENSHIN, NAKAMITSU, KAZUHITO, ITAGAKI, HIROMI
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method of building a floor for a boiler cage part is provided. The method first includes a step of building a single floor onto a lifting frame positioned on the ground, the whole lifting frame being positioned below the single floor. The method also includes a step of jacking-up the floor together with the lifting flame and then fixing the floor to a designated floor height. The method further includes a step of detaching the floor from the lifting flame followed by jacking-down the lifting flame to the ground. Multiple levels of floors are built from the higher most floor to the lower most floor by repeating the steps of building, jacking-up and jacking-down, which allows the method to be performed safely and efficiently on the ground.