METHOD OF USING A TEST TOOL TO DETERMINE FORMATION BUILD-UP IN A WELLBORE PENETRATING A SUBTERRANEAN FORMATION

A method is disclosed for estimating a formation pressure using a formation tester disposed in a wellbore penetrating a formation, said method comprising: (a) establishing fluid communication between a pretest chamber in the downhole tool and the formation via a flowline, the flowline having an init...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MANIN, YVES, LIGER, FRANCOIS
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method is disclosed for estimating a formation pressure using a formation tester disposed in a wellbore penetrating a formation, said method comprising: (a) establishing fluid communication between a pretest chamber in the downhole tool and the formation via a flowline, the flowline having an initial pressure therein; (b) moving a pretest piston in a controlled manner in the pretest chamber to reduce the initial pressure to a drawdown pressure during a drawdown phase; (c) terminating movement of the piston to permit the drawdown pressure to adjust to a stabilized pressure during a build-up phase and measuring simultaneously in relation to time, pressure P(t) and temperature T(t) in the pretest chamber; (d) extracting an index i(t) dependent of the pressure P(t) and the temperature T(t) informing on the build-up phase; (e) analyzing index i(t) and repeating steps (b) - (d) or going to step (f); (f) determining the formation pressure based on a final stabilized pressure in the flowline. And more generally a method could be used for estimating type of a build up pressure phase, the build up pressure phase being done after a drawdown pressure phase, said both drawdown and build up phases being done to determine formation pressure using a formation tester disposed in a wellbore penetrating a permeable formation, said permeable formation being able to create a formation flow, said method being characterized by using an index to determine the contribution of formation flow on the pressure build up phase. Linvention décrit un procédé destimation dune pression de formation à laide dun testeur de formation placé dans un puits de forage qui pénètre une formation, ledit procédé comprenant : (a) létablissement dune communication fluide entre une chambre de prétest dans loutil de fond de trou et la formation par une conduite découlement, la conduite découlement possédant une pression initiale à lintérieur de celle-ci; (b) le déplacement dun piston de prétest dune manière contrôlée dans la chambre de prétest pour réduire la pression initiale à une pression dabaissement pendant une phase dabaissement; (c) larrêt du mouvement du piston pour permettre à la pression dabaissement de se régler à une pression stabilisée pendant une phase daccumulation et la mesure simultanée en relation au temps, la pression P(t) et la température T(t) dans la chambre de prétest; (d) lextraction dun indice i(t) en fonction de la pression P(t) et la température T(t) renseignant sur la phase da