LIFTING CONSTRUCTION METHOD AND RAISING/LOWERING EQUIPMENT OF BOILER MODULE
An interference with existing structures is prevented at a time of a lifting construction of a boiler module. When the boiler module is lifted from the ground by lifting jacks provided on a steel frame main-beam and made an install construction to the main-beam, lifting jacks enabled to move lateral...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An interference with existing structures is prevented at a time of a lifting construction of a boiler module. When the boiler module is lifted from the ground by lifting jacks provided on a steel frame main-beam and made an install construction to the main-beam, lifting jacks enabled to move laterally on the main-beam are disposed at forward and backward thereof to suspend the boiler module. The suspended module is lifted up to the main-beam and installed while changing a suspending position between an interference preventing position with existing modules and a prescribed suspending position by alternately moving the forward and backward lifting jacks laterally. |
---|