METHOD FOR CONTROLLING WATER INFLUX INTO WELLBORES BY BLOCKING HIGH PERMEABILITY CHANNELS
A method of blocking a high permeability channel in communication with a wellbore, including the steps of introducing an amount of an unreinforced ge l into the high permeability channel via the wellbore and introducing an amount of a reinforced gel comprising an amount of a reinforcing material int...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method of blocking a high permeability channel in communication with a wellbore, including the steps of introducing an amount of an unreinforced ge l into the high permeability channel via the wellbore and introducing an amount of a reinforced gel comprising an amount of a reinforcing material into the high permeability channel via the wellbore. The method may further include the step, after introducing the unreinforced gel and the reinforced gel into the high permeability channel, of introducing an amount of a chaser fluid into t he wellbore. |
---|