ROCK BOLTING WITH STRANDED CABLE
In the drilling process, a continuous line is used to move a feed pipe to a position where a hole is to be bore in rock. A line (16) is fed through the feed pipe into the bore hole, and then the pipe is pressed to seal against the bore hole wall. The process then involves feeding a cement medium thr...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In the drilling process, a continuous line is used to move a feed pipe to a position where a hole is to be bore in rock. A line (16) is fed through the feed pipe into the bore hole, and then the pipe is pressed to seal against the bore hole wall. The process then involves feeding a cement medium through the pipe, and the pipe is then removed and the line severed. To seal the space between the line and the pipe, a seal (20) is compressed between them axially. This seal is an elastic, compressible ring forming a passage hole which is diminished radially, when the ring is axially compressed. |
---|