VERFAHREN ZUR BILDUNG EINES WASSERDICHTES UND DIE KRIECHGRENZE STEIGERNDEN ABSCHNITTES
A method for building a continuous water seal, creep line increasing cutoff includes the steps of forming spaced borings into the soil in the presence of slurry; developing narrow slots between the formed borings by driving foil boards with cutting edges secured to the bottom therof between adjacent...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | ger |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for building a continuous water seal, creep line increasing cutoff includes the steps of forming spaced borings into the soil in the presence of slurry; developing narrow slots between the formed borings by driving foil boards with cutting edges secured to the bottom therof between adjacent formed borings; and connecting adjacent foil board, which extend between and are recessed into a side of the borings, by means of compensating joint-pins. The steps of developing narrow slots and connecting adjacent foil boards are repeated so that the last boring is connected to the connected, recessecd foil boards forming the cutoff. A prefered embodiment of the invention may include armoring the borings by injecting concrete in the place of the slurry. |
---|