VERFAHREN UND VORRICHTUNG ZUR ERHALTUNG DER LEISTUNGSFÄHIGKEIT NEUER BRUNNEN SOWIE ZUR REINIGUNG UND REGENERIERUNG BESTEHENDER BRUNNEN MITTELS ULTRASCHALL

This novel procedure maintains the output of new wells, or cleans and regenerates existing ones. The filter is subjected to ultrasound radiated from a transducer. The water, now full of detached particles, is drawn out. The filter and the gravel section connected to it, are treated to achieve a degr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: BARTETZKO, ANDREAS, GEISEN, GERHARD, JACOBS, KLAUS, DR
Format: Patent
Sprache:ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This novel procedure maintains the output of new wells, or cleans and regenerates existing ones. The filter is subjected to ultrasound radiated from a transducer. The water, now full of detached particles, is drawn out. The filter and the gravel section connected to it, are treated to achieve a degree of cleaning, which is measured from the water extracted. The filter assembly is cleaned section by section with the transducer stationary, in the absence of mechanical or hydromechanical effects. Also claimed is a device to carry out the process. This includes two height-adjustable packing units containing transducer and extraction pump (7) which are moved in the well. The pump is in the upper pack (5), connected by a line (8) to the instrument (9) making the measurements.