North End Runway Material Extraction and Transport Environmental Assessment

The U.S. Department of Transportation, Maritime Administration (MARAD),in cooperation with Elmendorf Air Force Base (EAFB) and the Bureau of Land Management (BLM), proposes to remove approximately 9.8 million bank cubic yards of material from the North End Borrow Site and improve a roadway between t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Allen, Timo, Bartel, Janet, Brake, Diana, Butler, Laurie, Casper, Chuck, Henegan, Nicholas R, High, Leigh, Humphries, Bill, Novak, Dana C, Rudolph, Theresa
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The U.S. Department of Transportation, Maritime Administration (MARAD),in cooperation with Elmendorf Air Force Base (EAFB) and the Bureau of Land Management (BLM), proposes to remove approximately 9.8 million bank cubic yards of material from the North End Borrow Site and improve a roadway between the borrow site and the Port of Anchorage (POA or Port) for truck transport. The 255-acre proposed North End Borrow Site, which includes several borrow pits historically and currently used by EAFB, is located 4.75 miles northeast of the POA and immediately north of the EAFB North/South Runway. The purpose of the action is to meet a portion of the fill requirements for the planned 135-acre expansion of the Port, known as the Marine Terminal Redevelopment (MTR).