Final Environmental Assessment, Construction and Operation of Air Traffic Control Tower

78th Civil Engineer Group, Environmental Management Division (78 CEG/CEV) has conducted an Environmental Assessment (EA) to address the potential effects of construction and operation of a new Air Traffic Control Tower (ATCT) at Robins Air Force Base (AFB). The proposed new ATCT would modernize 78th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Allen, Charles, Branton, Kenneth, Slade, Patricia, Taylor, Chris
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:78th Civil Engineer Group, Environmental Management Division (78 CEG/CEV) has conducted an Environmental Assessment (EA) to address the potential effects of construction and operation of a new Air Traffic Control Tower (ATCT) at Robins Air Force Base (AFB). The proposed new ATCT would modernize 78th Operations Support Squadron (78th OSS) air traffic control operations and equipment; provide additional space for required air traffic control personnel, equipment and functions; and generally provide a more optimal work environment for air traffic control personnel. The existing Control Tower building would no longer be needed.