Final Environmental Assessment, Construction and Operation of Air Traffic Control Tower
78th Civil Engineer Group, Environmental Management Division (78 CEG/CEV) has conducted an Environmental Assessment (EA) to address the potential effects of construction and operation of a new Air Traffic Control Tower (ATCT) at Robins Air Force Base (AFB). The proposed new ATCT would modernize 78th...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | 78th Civil Engineer Group, Environmental Management Division (78 CEG/CEV) has conducted an Environmental Assessment (EA) to address the potential effects of construction and operation of a new Air Traffic Control Tower (ATCT) at Robins Air Force Base (AFB). The proposed new ATCT would modernize 78th Operations Support Squadron (78th OSS) air traffic control operations and equipment; provide additional space for required air traffic control personnel, equipment and functions; and generally provide a more optimal work environment for air traffic control personnel. The existing Control Tower building would no longer be needed. |
---|