The National Shipbuilding Research Program. 1997 Ship Production Symposium. Implementation of Integrated CAD/CAM Systems in Small and Medium Sized Shipyards: A Case Study
The Coast Guard Yard in Curtis Bay, MD implemented a PC/AutoCAD based CAD/CAM system and used it to construct a series of 15 M (49 foot) buoy tenders. Implementing CAD/CAM is primarily a management, rather than technical, challenge. Performance-Based Management Techniques were used to develop the ne...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The Coast Guard Yard in Curtis Bay, MD implemented a PC/AutoCAD based CAD/CAM system and used it to construct a series of 15 M (49 foot) buoy tenders. Implementing CAD/CAM is primarily a management, rather than technical, challenge. Performance-Based Management Techniques were used to develop the new system as an integrated whole, controlled and documented under ISO 9001. The was cost-effective, required minimum retraining, was fully implemented in a few months, and was appropriate to a small shipyard building boats, but extensible as required to medium sized ships. The authors discuss: 1) The use of Performance-Based Management and team-building techniques to help implement the process; 2) The use of process management techniques to document, control and systematically improved the process in order to remain competitive; 3) The process developed, including methods to allow varying levels of operator skill, geometry, weight and interference control, and development of automation techniques; 4) The lessons learned, the results in productivity improvement, and the future path for continuous improvement. |
---|