Final Report for the Concept Development of the Logistics Vehicle System Replacement
This report documents a 12 month effort to explore four areas of mobility enhancement for the LVSR: 1) Payload enhancement; 2) Power plant upgrade; 3) suspension upgrade; and 4) Terrain adaptive technologies. Included in the report are alternative vehicle concepts, performance analyses, VEHDYN2 ride...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This report documents a 12 month effort to explore four areas of mobility enhancement for the LVSR: 1) Payload enhancement; 2) Power plant upgrade; 3) suspension upgrade; and 4) Terrain adaptive technologies. Included in the report are alternative vehicle concepts, performance analyses, VEHDYN2 ride quality analysis, 3-D dynamic analyses, and a recommended LVSR configuration. |
---|