Enhanced Preliminary Assessment. Fort Des Moines. Des Moines, Iowa
An enhanced preliminary assessment was conducted at the Fort Des Moines (FDM) site which is planned for inclusion in the Base Closure Program. Included are 56 acres of the facility. During an on site inspection, no conditions were observed to be an imminent threat to human health. However, long-term...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An enhanced preliminary assessment was conducted at the Fort Des Moines (FDM) site which is planned for inclusion in the Base Closure Program. Included are 56 acres of the facility. During an on site inspection, no conditions were observed to be an imminent threat to human health. However, long-term threats to human health are possible as a result of leaking pole transformers and potential dispersal from a pesticide contaminated building. Other environmentally significant operations were: (1) Uncontrolled chemical storage, (2) Underground storage tanks, (3) Possible asbestos-containing materials inside and outside of buildings, (4) Firing ranges, (5) Possible polychlorinated biphenyls containing material on a roadway. Recommendations are made for groundwater well installation and sampling because of past spills, material storage and handling and documented contaminants.
Original contains color plates: All DTIC/NTIS reproductions will be in black and white. |
---|