C-12A Landing Gear Capability Tests
The United States Army Aviation Engineering Flight Activity conducted an evaluation of the C-12A aircraft. During the test program four flights totaling 3.8 hours were flown. Soft soil and simulated rough terrain operations were conducted. The C-12A met the requirements of the prime item development...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The United States Army Aviation Engineering Flight Activity conducted an evaluation of the C-12A aircraft. During the test program four flights totaling 3.8 hours were flown. Soft soil and simulated rough terrain operations were conducted. The C-12A met the requirements of the prime item development specification for operating on soft soil. If the aircraft is to be operated on rough/unprepared terrain, one deficiency was found during this test program: failure of the right main landing gear while braking over simulated rough terrain. |
---|