Development of a High Seas Oil Recovery System. Phase II. Appendix III. Systems Tests. Volume IV

The Phase-II report covers design, construction, and test of a prototype 2000 gpm oil recovery system for the high seas. The prototype system consists of a weir/basin assembly, transfer and control system, and auxiliary equipment which includes a handling system, packaging system, and a flotsam fenc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Beach,Robert L, March,Frank A, Brown,Louis S, McMahon,Terrance S, Papp,Joseph
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Phase-II report covers design, construction, and test of a prototype 2000 gpm oil recovery system for the high seas. The prototype system consists of a weir/basin assembly, transfer and control system, and auxiliary equipment which includes a handling system, packaging system, and a flotsam fence. The transfer system has four hydraulic-motor-driven gear pumps, a 300-ft. hydraulic umbilical, an oil-water interface sensor array, and a remote-control system. The report describes subsystems tests, component assembly, air transport capability, and a complete oil-recovery test in a pool at Battelle Northwest, Richland, Wa. Pool tests utilized light and heavy fuel oils in calm water and 2 foot waves, with tow speeds to 2.76 knots. See also AD/A-003 946.