SUBSURFACE ACCELERATIONS AND STRAINS FROM AN UNDERGROUND DETONATION, PART II
The objectives of the project were to measure transient and residual ground motion from Shot RAINIER, Operation PLUMBBOB. The measurements consisted of acceleration, pressure, stress, strain, and permanent displacement in the free field below the floor of the main entrance tunnel. (Author) Report on...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The objectives of the project were to measure transient and residual ground motion from Shot RAINIER, Operation PLUMBBOB. The measurements consisted of acceleration, pressure, stress, strain, and permanent displacement in the free field below the floor of the main entrance tunnel. (Author)
Report on Operation Plumbob, Project 26-4e. |
---|