Estimation of maximum non‐synchronous generation of renewable energy in the South Korea power system based on the minimum level of inertia
Managing the output of renewable energy sources considering their uncertainty and variability is crucial for resilience in power system operation. In addition, analyzing stability issues that may arise at the maximum output is important to ensure power system stability. Therefore, the authors propos...
Gespeichert in:
Veröffentlicht in: | IET renewable power generation 2024-05, Vol.18 (7), p.1260-1268 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Managing the output of renewable energy sources considering their uncertainty and variability is crucial for resilience in power system operation. In addition, analyzing stability issues that may arise at the maximum output is important to ensure power system stability. Therefore, the authors propose a method for estimating the maximum non‐synchronous generation (Max NSG) of renewable energy based on the minimum inertia of the power system. The minimum inertia is determined through the correlation between the available and required quantity of inertia and governor resources, satisfying the frequency standards in a South Korean power system. The Max NSG of renewable energy sources at that system inertia level is estimated based on the derived minimum inertia. The proposed method was applied to 22,612 operation data extracted from the Korea energy management system (K‐EMS). The authors estimated a linear relationship between demand levels and Max NSG, ranging from 52.6 to 3.83 GW. The study shows that Max NSG, which is difficult to estimate in many power system operating conditions, can be estimated based on minimum inertia considering the frequency stability in South Korean power systems.
• The proposed method derives the minimum inertia based on the correlation between the available and required capacity of inertia and governor resources, considering the frequency standard.
• The authors estimate Max NSG at the system level based on the minimum inertia.
• The authors estimate Max NSG by reviewing actual data that reflect various system operating conditions. |
---|---|
ISSN: | 1752-1416 1752-1424 |
DOI: | 10.1049/rpg2.12964 |