OPTYMISATION OF EQUIPMENT SETUP PROCESSES IN ENTERPRISES

Fast equipment setup in a machine on production line is the key precondition to increase the flexibility of the production. Methodology of SMED (Single Minute Exchange of Die) is an example which allows reducing the time of setup practically to the minimum. The article presents the theoretical bases...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Metalurgija 2012-10, Vol.51 (4), p.555-558
Hauptverfasser: Grzybovvska, K, Gajdzik, B
Format: Artikel
Sprache:hrv ; eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Fast equipment setup in a machine on production line is the key precondition to increase the flexibility of the production. Methodology of SMED (Single Minute Exchange of Die) is an example which allows reducing the time of setup practically to the minimum. The article presents the theoretical bases and required rules as well as case study conducted in one of chosen enterprises. This paper also answers the question if SMED methodology is applicable in metallurgical sector, presenting the example of shortening the time between the production of various metallurgical products manufactured in the machine for continuous casting of steel (COS in Polish).
ISSN:0543-5846
1334-2576