Technique for estimating the time spent on measuring and computing process in three-dimensional electrical impedance tomography
The work is devoted to the problems of estimating time delays that arise in studies using the method of three-dimensional electrical impedance tomography. The block diagram of the hardware-software complex of three-dimensional electrical impedance tomography is considered. A general algorithm for vi...
Gespeichert in:
Veröffentlicht in: | E3S web of conferences 2023-01, Vol.420, p.5002 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The work is devoted to the problems of estimating time delays that arise in studies using the method of three-dimensional electrical impedance tomography. The block diagram of the hardware-software complex of three-dimensional electrical impedance tomography is considered. A general algorithm for visualizing the internal structures of the object under study by the method of three-dimensional electrical impedance tomography is described, and it is shown which parts of it affect the occurrence of time delays. Methods for minimizing the time delays that occur during research are described, which will reduce the time for obtaining research results and increase the frequency of their output. |
---|---|
ISSN: | 2267-1242 2267-1242 |
DOI: | 10.1051/e3sconf/202342005002 |