A New Control Chart for Monitoring the Process Mean Using Successive Sampling and Multiple Dependent State Repetitive Sampling

In this paper, a new control chart scheme has been developed for monitoring the production process mean using successive sampling over two occasions. The proposed chart reduces to three different existing control charts under different assumptions and is compared with these three existing control ch...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Technologies (Basel) 2018-09, Vol.6 (3), p.70
Hauptverfasser: Aldosari, Mansour Sattam, Aslam, Muhammad, Jun, Chi-Hyuck, Khan, Khushnoor
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, a new control chart scheme has been developed for monitoring the production process mean using successive sampling over two occasions. The proposed chart reduces to three different existing control charts under different assumptions and is compared with these three existing control charts for monitoring the process average. It has been observed that the proposed control chart performs better than the other existing control charts in terms of average run length (ARL). A simulation study using an artificial data set was included for demonstrating the process shift detection power of the proposed control chart.
ISSN:2227-7080
2227-7080
DOI:10.3390/technologies6030070