Optimum Placement of Distribution Generation Units in Power System with Fault Current Limiters Using Improved Coyote Optimization Algorithm
Electric power frameworks become intensely loaded because of the expanded power demand, and as a result, the power system faces great power losses and fault currents. The integration of Distribution Generation (DG) units plays a key role in minimizing the load pressure on a power system. DGs are tra...
Gespeichert in:
Veröffentlicht in: | Entropy (Basel, Switzerland) Switzerland), 2021-05, Vol.23 (6), p.655 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Electric power frameworks become intensely loaded because of the expanded power demand, and as a result, the power system faces great power losses and fault currents. The integration of Distribution Generation (DG) units plays a key role in minimizing the load pressure on a power system. DGs are transmitted with a high fault current, which surpasses the evaluations of circuit breakers. This paper presents various DG units’ optimal placement with Fault Current Limiters (FCLs) in different phases. The Improved Coyote Optimize Algorithm (ICOA) and Electrical Transient Analyzer Program (ETAP) are assessed for the proposed technique in terms of normal and faulty working status. Similarly, to enhance the efficiency of a distribution system, a fuzzy-based multi-objective mechanism is applied. The proposed method is employed on an IEEE 21-bus and 28-bus distribution system. The simulation analysis proved that the power losses and fault levels are reduced at an acceptable level. |
---|---|
ISSN: | 1099-4300 1099-4300 |
DOI: | 10.3390/e23060655 |