Recalce en condiciones de emergencia: 40 viviendas cercanas al río Guadalquivir, España

The reconstruction works in buildings under emergency conditions and, more specifically, the foundation repaired has been poorly documented in rehabilitation. This is due, in some extend, to not make public this type of reports mainly due to its complexity and possible related responsibilities. In t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Informes de la construcción 2016, Vol.68 (541), p.e133-e133
Hauptverfasser: A Ferreira Sánchez, Alba Rodríguez, Mª D, Ramírez-de-Arellano, A, Marrero, M
Format: Artikel
Sprache:eng ; spa
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The reconstruction works in buildings under emergency conditions and, more specifically, the foundation repaired has been poorly documented in rehabilitation. This is due, in some extend, to not make public this type of reports mainly due to its complexity and possible related responsibilities. In the present article, the foundation recovery of a building with 40 flats, located in Seville, Spain, near the Guadalquivir River which was affected by the excavations of an underground parking lot are explained. Three different techniques are considered and compared; finally, the micropile solution implemented is explained, technically and economically. Micropiles were chosen due to, among other aspects, the soil quality. The experience gives rise to three main factors in a successful work: the organization, the scheduling and the neighbors’ participation in the work programming.
ISSN:0020-0883
1988-3234
DOI:10.3989/ic.14.132