Evaluation of the project overhead costs in iraqi construction industry using fuzzy analytic hierarchy process (FAHP)
This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an...
Gespeichert in:
Veröffentlicht in: | Journal of Engineering 2018-10, Vol.24 (11), p.68-83 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | ara ; eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This research investigated the importance and priorities of the project overhead costs in Iraq via
a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this
technique is very important in the uncertain circumstances as in our country. The researcher
reached to frame an equation through the results of the priorities of weights include the
percentages of each of the main items of the project overhead costs. The researcher tested this
equation by applying it to one of the completed projects and the results showed suitability for the
application. The percentages of the (salaries, grants, and incentives) and (fieldwork
requirements) in equation represent approximately two-thirds of project overhead costs. So the
contractors should deal with the project overhead costs carefully during estimate the bid.
Keywords: project Overhead, Costs, FAHP, Construction Industry |
---|---|
ISSN: | 1726-4073 2520-3339 |
DOI: | 10.31026/j.eng.2018.11.06 |