White filler production plant "Alusil", Zvornik
Experts of the IGPC developed a white filler production technology in the laboratories, and then started production at the "Alusil", Zvornik complex. This plant was constructed in 1987 with a capacity of 20,000 t/y. The product meets all quality demands, as well as environmental regulation...
Gespeichert in:
Veröffentlicht in: | Hemijska industrija 2003, Vol.57 (2), p.54-57 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Experts of the IGPC developed a white filler production technology in the laboratories, and then started production at the "Alusil", Zvornik complex. This plant was constructed in 1987 with a capacity of 20,000 t/y. The product meets all quality demands, as well as environmental regulations. There is no waste material in white fillers production, because all filtrates are kept in closed cycles. Production process is fully automatized, with minimal need for human intervention. The production process can be controlled manually, which is necessary during start - up, and repairs.
Strucnjaci HP I0FH su razvili tehnologiju za proizvodnju belih punila u laboratoriji, a zatim su je postavili u fabricku liniju u okviru aluminosilikatnog kompleksa "Alusil" u Zvorniku. Fabrika je izgradjena 1987. godine sa kapacitetom 20.000 tig. |
---|---|
ISSN: | 0367-598X 2217-7426 |
DOI: | 10.2298/HEMIND0302054S |