A BAT ALGORITHM FOR REALISTIC HYBRID FLOWSHOP SCHEDULING PROBLEMS TO MINIMIZE MAKESPAN AND MEAN FLOW TIME
This paper addresses the multistage hybrid flow shop (HFS) scheduling problems. The HFS is the special case of flowshop problem. Multiple parallel machines are considered in each stage in the HFS. The HFS scheduling problem is known to be strongly NP-hard. Hence, many researchers proposed metaheuris...
Gespeichert in:
Veröffentlicht in: | ICTACT journal on soft computing 2012-10, Vol.3 (1), p.428-433 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper addresses the multistage hybrid flow shop (HFS) scheduling problems. The HFS is the special case of flowshop problem. Multiple parallel machines are considered in each stage in the HFS. The HFS scheduling problem is known to be strongly NP-hard. Hence, many researchers proposed metaheuristic algorithms for solving the HFS scheduling problems. This paper develops a bat algorithm (BA) to the HFS scheduling problem to minimize makespan and mean flow time. To verify the developed algorithm, computational experiments are conducted and the results are compared with other metaheuristic algorithms from the literature. The computational results show that the proposed BA is an efficient approach in solving the HFS scheduling problems. |
---|---|
ISSN: | 0976-6561 2229-6956 |
DOI: | 10.21917/ijsc.2012.0066 |