INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT
The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM). EVM is a well-known approach in project management context that can monitor schedule and cost performance indexes in projects simul...
Gespeichert in:
Veröffentlicht in: | Journal of civil engineering and management 2020-06, Vol.26 (6), p.524-533 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The primary purpose of the current study is introducing a comprehensive approach to identify the relationship
among different criteria in Earned Value Management (EVM). EVM is a well-known approach in project management context that can monitor
schedule and cost performance indexes in projects simultaneously. The EVM detects current project performances and also predicts at
completion costs of the project. In this study, employing Interpretive Structural Modelling, interactions which exist among affecting
factors on EVM’s success are determined. First, all of the practical factors on EVM are determined and categorized into four main
clusters; then the most effective ones are separated from the clusters; eventually, ISM is used based on eleven ultimate critical
criteria. The results demonstrate that “Instability in the construction market” and “Macroeconomic indicators” are the most influencing
factors affecting the EVM. Finally, a novel method for enhancing the performance of conventional EVM is presented. The proposed approach
would be highly applicable for engineering managers who are willing to promote the current performance of the systems. Most studies have
been previously carried out on the applications of the EVM in terms of improving final cost and total duration elapsed whereas there
is not any particular study on the EVM issue which has stated the key factors that influence the EVM and lasting effect on the project
performance. It should be noted that the proposed approach can be employed through the life cycle of any project particularly in
construction projects. |
---|---|