Duration of work on the survey of buildings and structures

This article is devoted to the problem of determining the duration of survey work. In this article, the main stages of conducting a survey of buildings and structures are considered, and the principle of determining the maximum duration of the survey is proposed. This principle consists in dividing...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:BIO web of conferences 2024-01, Vol.107, p.6018
1. Verfasser: Efimov, Vladimir
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This article is devoted to the problem of determining the duration of survey work. In this article, the main stages of conducting a survey of buildings and structures are considered, and the principle of determining the maximum duration of the survey is proposed. This principle consists in dividing the object into groups according to the complexity of the object and the work performed. The geometric characteristics of the object were taken as the basis of the complexity of the object, and the types of work were based on the group of complexity of the work. After determining the complexity at the representative objects of each combination of complexity groups, time measurements were made based on the results of which the average time of work on the survey of buildings and structures per 100 m 2 of the object was determined
ISSN:2117-4458
2117-4458
DOI:10.1051/bioconf/202410706018