Allocation and scheduling of deposition paths in a layer for multi-robot coordinated wire and arc additive manufacturing of large-scale parts

ABSTRACTIn multi-robot cooperative wire and arc additive manufacturing (MRC-WAAM) systems, allocating and scheduling deposition tasks is necessary. The challenge comes from the factorial computational complexity when optimising robot time, workload, and deposition order. This work presents a novel m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Virtual and physical prototyping 2024-12, Vol.19 (1)
Hauptverfasser: Li, Yongzhe, Meng, Lingyi, Li, Minglang, Zhou, Yijun, Liu, Xiaochao, Li, Xinlei, Zhang, Guangjun
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:ABSTRACTIn multi-robot cooperative wire and arc additive manufacturing (MRC-WAAM) systems, allocating and scheduling deposition tasks is necessary. The challenge comes from the factorial computational complexity when optimising robot time, workload, and deposition order. This work presents a novel method, ‘top k%’. The main idea is to iteratively assign k% amount of paths from a warehouse to the robot having the least workload until all paths are set. A collision-free deposition process is scheduled by checking the overlapping conditions of robot swap areas. Both simulative testing and actual depositions were conducted to validate the applicability and effectiveness of the method. The results indicated that the ‘top k%’ method can facilitate the equality of robot workload and enhance the adjacency of paths. The top k% method outperforms the existing solutions concerning a reduction of turns and start-arc points, which improves the forming quality of MRC-WAAM.
ISSN:1745-2759
1745-2767
DOI:10.1080/17452759.2023.2300680