Prediction of coal mine roof water damage based on micro-seismic monitoring technology

Taking 307 working face of Tingnan Coal Mine as the engineering background, in order to verify the reliability of real-time monitoring of water flowing fractured zone height by micro-seismic monitoring data, the mechanical numerical simulation software is used. In order to analyze the relationship b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mei kuang an quan 2023-05, Vol.54 (5), p.49-55
1. Verfasser: LIAN Huiqing, YANG Yi, YANG Songlin, TANG Zhongyi, XU Bin, PEI Wenxian, WANG Rui, LI Qixing
Format: Artikel
Sprache:chi
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Taking 307 working face of Tingnan Coal Mine as the engineering background, in order to verify the reliability of real-time monitoring of water flowing fractured zone height by micro-seismic monitoring data, the mechanical numerical simulation software is used. In order to analyze the relationship between micro-seismic events and roof water inflow, the mathematical statistics method is used to establish the correlation between them. The results show that the micro-seismic events in 307 working face are concentrated in the areas with serious overburden damage under different driving distances, which can reflect the overburden damage and the development height of the water conducting fracture zone; the numerical simulation results of working face mining are basically consistent with the change rules of micro-seismic monitoring events. The highly developed water conducting fracture zone is characterized by “rapid growth in the early stage, slow growth in the middle stage, and balance in the later stage”. The num
ISSN:1003-496X
DOI:10.13347/j.cnki.mkaq.2023.05.008