Construction and Commissioning of PAL-XFEL Facility

The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL), a 0.1-nm hard X-ray free-electron laser (FEL) facility based on a 10-GeV S-band linear accelerator (LINAC), is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was compl...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied sciences 2017-05, Vol.7 (5), p.479
Hauptverfasser: Ko, In, Kang, Heung-Sik, Heo, Hoon, Kim, Changbum, Kim, Gyujin, Min, Chang-Ki, Yang, Haeryong, Baek, Soung, Choi, Hyo-Jin, Mun, Geonyeong, Park, Byoung, Suh, Young, Shin, Dong, Hu, Jinyul, Hong, Juho, Jung, Seonghoon, Kim, Sang-Hee, Kim, KwangHoon, Park, Soung, Park, Yong, Jung, Young, Jeong, Seong, Lee, Hong, Lee, Sangbong, Lee, Sojeong, Oh, Bonggi, Suh, Hyung, Han, Jang-Hui, Kim, Min, Jung, Nam-Suk, Kim, Young-Chan, Lee, Mong-Soo, Lee, Bong-Ho, Sung, Chi-Won, Mok, Ik-Su, Yang, Jung-Moo, Parc, Yong, Lee, Woul-Woo, Lee, Chae-Soon, Shin, Hocheol, Kim, Ji, Kim, Yongsam, Lee, Jae, Park, Sang-Youn, Kim, Jangwoo, Park, Jaeku, Eom, Intae, Rah, Seungyu, Kim, Sunam, Nam, Ki Hyun, Park, Jaehyun, Park, Jaehun, Kim, Sangsoo, Kwon, Soonnam, An, Ran, Park, Sang, Kim, Kyung, Hyun, Hyojung, Kim, Seung, Kim, Seonghan, Yu, Chung-Jong, Kim, Bong-Soo, Kang, Tai-Hee, Kim, Kwang-Woo, Kim, Seung-Hwan, Lee, Hee-Seock, Lee, Heung-Soo, Park, Ki-Hyeon, Koo, Tae-Yeong, Kim, Dong-Eon, Lee, Ki
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL), a 0.1-nm hard X-ray free-electron laser (FEL) facility based on a 10-GeV S-band linear accelerator (LINAC), is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was completed by the end of 2014, and the installation of the 10-GeV LINAC and undulators started in January 2015. The installation of the 10-GeV LINAC, together with the undulators and beamlines, was completed by the end of 2015. The commissioning began in April 2016, and the first lasing of the hard X-ray FEL line was achieved on 14 June 2016. The progress of the PAL-XFEL construction and its commission are reported here.
ISSN:2076-3417
2076-3417
DOI:10.3390/app7050479