Comparative Life Cycle Cost Analysis of Hardening Options for Critical Loads

In order to determine the most cost effective alternative among hardening options of power systems, the direct monetary benefits should be evaluated above all other things. Therefore, this paper presents a life-cycle cost model which describes total monetary costs experienced in annual time incremen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energies (Basel) 2016-07, Vol.9 (7), p.553
Hauptverfasser: Park, Sungmin, Park, Sung-Yeul, Zhang, Peng, Luh, Peter, Rakotomavo, Michel, Serna, Camilo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In order to determine the most cost effective alternative among hardening options of power systems, the direct monetary benefits should be evaluated above all other things. Therefore, this paper presents a life-cycle cost model which describes total monetary costs experienced in annual time increments during the project with consideration for the time value of money. In addition, to minimize the risks associated with estimated cost errors due to uncertainties of input data, the stochastic input data are considered. Using the Monte Carlo method, the probabilities and cost ranges in the case studies can be predicted, in turn resulting in better decisions in the selection of hardening options which are cost effective.
ISSN:1996-1073
1996-1073
DOI:10.3390/en9070553