Ensuring minimum duration of transient processes in switched voltage regulators with digital control
This paper describes a solution suggested to minimize the finite transient duration of a switched voltage regulator (SVR) for step changes in load current. SVR control laws aimed at minimizing the transient time are synthesized, and the microprocessor-based architecture and operating algorithms of t...
Gespeichert in:
Veröffentlicht in: | EAI endorsed transactions on energy web 2019-10, Vol.6 (24), p.160838 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper describes a solution suggested to minimize the finite transient duration of a switched voltage regulator (SVR) for step changes in load current. SVR control laws aimed at minimizing the transient time are synthesized, and the microprocessor-based architecture and operating algorithms of the control system are designed. The prototype of the SVR digital control unit is implemented on the field-programmable gate array integrated circuit Cyclone III EP3C120F780 using the NIOS II soft-processor core. Embedded software is developed to calculate the control pulse duration for power switches in accordance with the synthesized control laws taking into account the feedback loop signal. A case study of the prototype shows that it provides the duration of transients caused by a load current step change, equal to 3-4 conversion periods at the frequency of 120 kHz. It confirms the suitability of the developed models, algorithms and control laws for ensuring the minimum transient duration. |
---|---|
ISSN: | 2032-944X 2032-944X |
DOI: | 10.4108/eai.16-10-2019.160838 |