Planning and application of embedded DC transmission technology in the provincial transmission power grid
As the typical provincial transmission power grid,Jiangsu power grid is faced with the pressures and challenges induced from system-integration of rapid developments of renewable energy during the energy transition period,which needs to be upgraded in "source-network-load-storage" and othe...
Gespeichert in:
Veröffentlicht in: | 电力工程技术 2022-11, Vol.41 (6), p.65-74 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | chi |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | As the typical provincial transmission power grid,Jiangsu power grid is faced with the pressures and challenges induced from system-integration of rapid developments of renewable energy during the energy transition period,which needs to be upgraded in "source-network-load-storage" and other aspects. Through the analysis of energy development from load,power supply,grid structure in Jiangsu,challenges faced by Jiangsu power grid such as insufficient transfer abilities of important transmission sections are put forward. Considering the large-scale integrated renewable energy and structure characteristics of Jiangsu transmission power grid,transmission-capacity demands of the Yangtze-river-crossing section during the "14th Five-Year Plan" and future are emphatically analyzed. Afterwards embedded DC transmission technology that both the transmission-and receiving-ends are located in Jiangsu AC network and distributed on both sides of the Yangtze River are proposed. Comparing with the traditional long-distance and |
---|---|
ISSN: | 2096-3203 |