Feasibility study on infilling of horizontal wells with difficult to recover reserves in Fuyu reservoir

Aiming at the inter well drive immobile remaining oil in Fuyu oil layer of block 1 due to the non densification of surface village coverage, taking into account the undeveloped reserves that can not be produced by vertical wells due to being located in the wetland protection area along the river, th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:E3S web of conferences 2021, Vol.329, p.1042
1. Verfasser: Zheng, Siqi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Aiming at the inter well drive immobile remaining oil in Fuyu oil layer of block 1 due to the non densification of surface village coverage, taking into account the undeveloped reserves that can not be produced by vertical wells due to being located in the wetland protection area along the river, the feasibility study of layered densification of horizontal wells in the main oil layer with good reservoir development is carried out to explore a new densification mode of horizontal wells in Fuyu tight oil reservoir.
ISSN:2267-1242
2555-0403
2267-1242
DOI:10.1051/e3sconf/202132901042