Short-Term Photovoltaic Power Forecasting Based on Historical Information and Deep Learning Methods

The accurate prediction of photovoltaic (PV) power is essential for planning power systems and constructing intelligent grids. However, this has become difficult due to the intermittency and instability of PV power data. This paper introduces a deep learning framework based on 7.5 min-ahead and 15 m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Sensors (Basel, Switzerland) Switzerland), 2022-12, Vol.22 (24), p.9630
Hauptverfasser: Guo, Xianchao, Mo, Yuchang, Yan, Ke
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The accurate prediction of photovoltaic (PV) power is essential for planning power systems and constructing intelligent grids. However, this has become difficult due to the intermittency and instability of PV power data. This paper introduces a deep learning framework based on 7.5 min-ahead and 15 min-ahead approaches to predict short-term PV power. Specifically, we propose a hybrid model based on singular spectrum analysis (SSA) and bidirectional long short-term memory (BiLSTM) networks with the Bayesian optimization (BO) algorithm. To begin, the SSA decomposes the PV power series into several sub-signals. Then, the BO algorithm automatically adjusts hyperparameters for the deep neural network architecture. Following that, parallel BiLSTM networks predict the value of each component. Finally, the prediction of the sub-signals is summed to generate the final prediction results. The performance of the proposed model is investigated using two datasets collected from real-world rooftop stations in eastern China. The 7.5 min-ahead predictions generated by the proposed model can reduce up to 380.51% error, and the 15 min-ahead predictions decrease by up to 296.01% error. The experimental results demonstrate the superiority of the proposed model in comparison to other forecasting methods.
ISSN:1424-8220
1424-8220
DOI:10.3390/s22249630