Carbon emission monitoring method and empirical study of expressway construction period

In order to improve the ability of carbon emission management in expressway construction, the precision management of carbon emission is realized. In this paper, the construction period carbon emission monitoring method is proposed, the carbon emission monitoring scope is defined, and the carbon emi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:E3S web of conferences 2024, Vol.528, p.3019
Hauptverfasser: Wang, Jun, Yu, Xuejuan, Hai, Xi, Ming, Zhu, Yang, Yousen
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In order to improve the ability of carbon emission management in expressway construction, the precision management of carbon emission is realized. In this paper, the construction period carbon emission monitoring method is proposed, the carbon emission monitoring scope is defined, and the carbon emission monitoring content and method are determined. On this basis, taking the Zhangjinggao Yangtze River Bridge project as an example, analyze the monitoring data of construction carbon emissions. The results of the study showed that from July to December, the total carbon emission from construction was 668.30t. Among them, the carbon emissions of electricity, machinery and equipment, labor and construction water accounted for 47.02%, 40.68%, 11.99% and 0.31% of the total carbon emissions, respectively. In addition, the unit time carbon emission of the excavator is 12.12kg/h; The unit time carbon emission of the truck crane is 1.35kg/h.
ISSN:2267-1242
2267-1242
DOI:10.1051/e3sconf/202452803019