Bi-objective Scheduling of no wait flexible flow lines with a time window and the possibility of work rejecting

One of the main challenges for manufacturers in production systems on order is balancing between orders, inputs and limited resources. Hence, they have to choose some orders and reject the others. In addition, work schedule must be considered in order acceptance. In this research the integrated prob...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mudīrīyat-i ṣanʻatī 2015-09, Vol.7 (3), p.445-468
Hauptverfasser: Babak Aslani, Mostafa Zandieh, Majid Adeli
Format: Artikel
Sprache:per
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:One of the main challenges for manufacturers in production systems on order is balancing between orders, inputs and limited resources. Hence, they have to choose some orders and reject the others. In addition, work schedule must be considered in order acceptance. In this research the integrated problem of scheduling and order acceptance in a no wait flexible flow line production system is discussed. In this study orders that can’t be delivered in due date are rejected . Most researches are single objective optimization but in real world different objectives should be considered in the decision making. Therefor a bi-objective model which maximizes profit and minimize delivery deviation, is presented. Due to the high complexity of the model, the exact methods are not able to produce the optimal solution , so the two meta- heuristic algorithms MOSA and NSGA II for this problem were developed and their performance were compared through quantitative indicators in three different categories.
ISSN:2008-5885
2423-5369
DOI:10.22059/imj.2015.57259