Studying the technological process formation of mole drainage from a mole ripper

In this article, a layered perforator is a pit softener construction depending on the density, hardness and moisture of the soil during the operation of the working columns normal and trial stresses and in the hole opener working unit of all working columns of the device it was found that these calc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:E3S web of conferences 2024-01, Vol.486, p.3013
Hauptverfasser: Juraev, Fazliddin, Ibodov, Nabijon, Sharipova, Dilnora, Do‘stova, Salima, Avliyoqulov, Muhammad
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this article, a layered perforator is a pit softener construction depending on the density, hardness and moisture of the soil during the operation of the working columns normal and trial stresses and in the hole opener working unit of all working columns of the device it was found that these calculated formulas are relevant for all hole openers, taking into account that the normal and test stresses are equally affected. The spacing of the hanging holes can be changed from b1=b2=50 cm to 1.5 m, taking into account the mechanical composition of the soil and the level of salinity. It is suggested that the working bodies are layered, i.e., the 1st processing depth is from 40 to 45 cm, and the 2nd processing depth is from 80 to 90 cm.
ISSN:2267-1242
2267-1242
DOI:10.1051/e3sconf/202448603013