FRAGMENTATION ISSUE IN MALAYSIAN INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECTS

As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialised Building System (IBS), as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by usi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of engineering science & technology 2014-02, Vol.9 (1), p.97-106
Hauptverfasser: MOHD NASRUN MOHD NAWI, ANGELA LEE, MOHAMED NOR AZHARI AZMAN, KAMARUL ANUAR MOHAMAD KAMAR
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialised Building System (IBS), as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach. This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a number of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.
ISSN:1823-4690