Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for...
Gespeichert in:
Veröffentlicht in: | Chengshi Guidao Jiaotong Yanjiu 2024-10, Vol.27 (10), p.322-325 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | chi |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for both Line 3 and Line 11. To meet the urgent need for capacity enhancement, a renovation plan of the signaling system for Line 3 and Line 11 through train operation is required. Method The existing conditions and technical differences between the signaling systems of Line 3 and Line 11 are analyzed. Based on different wireless communication standards, a signaling system renovation plan is proposed to meet the requirements of the through train operation between two lines. The implementation plan for the signaling system renovation is designed according to the project preparation schedule for Line 3 and Line 11 signaling system upgrade, focusing on modifications of the on-board signaling subsystem, ATS (automatic trai |
---|---|
ISSN: | 1007-869X |
DOI: | 10.16037/j.1007-869x.2024.10.059 |