Collaborative scheduling method of active-reactive power for rural distribution systems with a high proportion of renewable energy
Large-scale distributed renewable energy connected to the rural distribution network has given birth to a new rural distribution system with a high proportion of new energy typical characteristics, and the optimal scheduling of the new rural distribution system has become an important issue to ensur...
Gespeichert in:
Veröffentlicht in: | Frontiers in energy research 2024-05, Vol.12 |
---|---|
Hauptverfasser: | , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Large-scale distributed renewable energy connected to the rural distribution network has given birth to a new rural distribution system with a high proportion of new energy typical characteristics, and the optimal scheduling of the new rural distribution system has become an important issue to ensure the safe and stable operation of the power grid. This paper proposes a method of active-reactive power collaborative optimization scheduling for rural power distribution system with a high proportion of renewable energy. Firstly, the active support capability evaluation model is established, and the active power support capability and reactive power support capability of rural power distribution system are quantitatively evaluated, which provides data basis and boundary conditions for the scheduling part. Then, considering power-loss cost, distribution network operation cost, and penalty cost, a method of active-reactive power collaborative optimization scheduling for rural power distribution systems with a high proportion of renewable energy is proposed. Finally, the active support capability evaluation and regulation platform of the rural power distribution system is built to provide technical support services for the safe and stable operation of the rural power distribution system. Given the problems of overload and overvoltage faced by rural power distribution systems with a high proportion of renewable energy, this paper aims to solve the key technical challenges of optimization and regulation of new rural power distribution systems. The results show that the optimized control method proposed in this paper has better security and economy, and is conducive to promoting the construction and operation of the new rural power distribution system. |
---|---|
ISSN: | 2296-598X 2296-598X |
DOI: | 10.3389/fenrg.2024.1410694 |