Modelling of heat transfer process in condensing unit with titanium alloy tubes

One of the most important units of heat transfer equipment of a nuclear power plant is the condenser. Currently, at the nuclear stations of concern “Rosenergoatom” work is actively underway to replace the tubes of copper containing alloys to various steels or titanium alloys. Also, active work is un...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:MATEC Web of Conferences 2017-01, Vol.110, p.1049
Hauptverfasser: Lavrinenko, Sergey, Polikarpov, Pavel, Matveeva, Anastasiya, Martyshev, Vladimir
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:One of the most important units of heat transfer equipment of a nuclear power plant is the condenser. Currently, at the nuclear stations of concern “Rosenergoatom” work is actively underway to replace the tubes of copper containing alloys to various steels or titanium alloys. Also, active work is underway on modernization of heat-exchange equipment of operating units. It is necessary to make the modelling of the parameters of condenser, to ensure that after the upgrade, the unit will continue operating normally. For this purpose, was created the model of module of tube bundle of condenser unit of K-33160 with tubes of titanium alloy. The modelling process is based on the equation of heat balance. In this work were modelled condenser of NPP of K-33160 with WWER-1000 reactor and the tubes of a titanium alloy VT0-1. The calculation was carried out for three presented methods and the error was less than 2%.
ISSN:2261-236X
2274-7214
2261-236X
DOI:10.1051/matecconf/201711001049