The continuum of Information Systems project success: Reflecting on the correlation between project success dimensions
Information systems (IS) project success has been a perennial bane of many researchers. Although there are short, medium and long-term dimensions to success, the reality is that they are inseparably linked. Time plays a significant role as a stakeholder, such as a project manager who has short-term...
Gespeichert in:
Veröffentlicht in: | South African computer journal = Suid-Afrikaanse rekenaartydskrif 2021-07, Vol.33 (1), p.37-58 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Information systems (IS) project success has been a perennial bane of many researchers. Although there are short, medium and long-term dimensions to success, the reality is that they are inseparably linked. Time plays a significant role as a stakeholder, such as a project manager who has short-term interests. In contrast, a business executive has long-term interests for the organisation as a whole. Project success is arguably a continuum where each dimension plays a role in realising long-term benefits for the organisation. This research investigates IS projects specifically to understand the argued correlation between short, medium and long-term project success dimensions. A total of 612 valid responses were collected through an online questionnaire. Quantitative analysis through PLS-SEM was conducted to reveal the correlation between success dimensions. The overall implication is that short-term IS project success does not directly correlate with long-term IS project success. However, there is a clear correlation between the time phases of IS project success. This research shows medium-term success mediates the relationship and correlation of short and long-term success. While literature acknowledges the relationship literature, this research confirms this notion and proves a significant correlation between each IS project success dimension over time. |
---|---|
ISSN: | 1015-7999 2313-7835 |
DOI: | 10.18489/sacj.v33i1.873 |