A TWO-STAGE GREEDY HEURISTIC FOR A FLOWSHOP SCHEDULING PROBLEM UNDER TIME-OF-USE ELECTRICITY TARIFFS

This paper studies a two-machine flowshop scheduling problem under time-dependent electricity tariffs, in which electricity prices may vary from time to time throughout the day. The main issue is to assign a set of jobs to available time slots with different electricity prices to minimise the total...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:South African journal of industrial engineering 2018-05, Vol.29 (1), p.143-154
Hauptverfasser: Pilerood, Amir Ebrahimzadeh, Heydari, Mehdi, Mazdeh, Mohammad Mahdavi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper studies a two-machine flowshop scheduling problem under time-dependent electricity tariffs, in which electricity prices may vary from time to time throughout the day. The main issue is to assign a set of jobs to available time slots with different electricity prices to minimise the total resource cost required for processing the jobs. The main contribution of this work is two-fold. First, a new continuous-time mixed-integer linear programming (MILP) model is proposed for the problem. Second, a two-stage greedy heuristic is developed. A computational experiment on randomly generated instances demonstrates that the greedy algorithm can improve the objective function by almost 40 percent. The algorithm can be applied by production managers to scheduling jobs in a flowshop under time-of-use (TOU) electricity tariffs to save electricity costs.
ISSN:2224-7890
1012-277X
2224-7890
DOI:10.7166/29-1-1898